Stage 01 / 09
Design
Artworks and construction notes are locked before fabric is booked. Tech packs include GSM, stitch type, and label placement.
- Tech pack signed
- Colourways confirmed
Production map
Nine stations. Sample lead time 7–12 working days. Bulk 4–5 weeks after confirmation.
Stage 01 / 09
Artworks and construction notes are locked before fabric is booked. Tech packs include GSM, stitch type, and label placement.
Stage 02 / 09
Base size is fitted, then graded across the run so bulk does not drift from the approved sample.
Stage 03 / 09
When the style needs all-over colour, fabric is printed and heat-set before it reaches the cutting table.
Stage 04 / 09
Fabric is checked for GSM and shrinkage, then cut in bulk lays so panels stay consistent across the order.
Stage 05 / 09
Crests, sponsors, and player marks go on before or after assembly depending on the method.
Stage 06 / 09
Industrial lines join panels with reinforced seams built to move. Our spec targets 10–14 stitches per inch.
Stage 07 / 09
Every unit is checked against an AQL 2.5 plan: stitch, size, print, and trim — not only a final glance.
Stage 08 / 09
Folded, tagged, and bagged to your artwork. Size stickers and carton marks follow the buyer sheet.
Stage 09 / 09
Cartoned with export documents and handed to courier or freight forwarder for worldwide lanes.
Capabilities
Sublimation, screen, heat transfer, vinyl.
Cut, stitch, bonding, laser finishing.
Embroidery, woven labels, hangtags, bags.
Circular knit with custom cushioning maps.
Share product type, quantity, and destination. This form is front-end only for the demo.
Request a quote